For Domestic air-tightness testers

AI call handling for
Domestic air-tightness testers.

A domestic air-tightness test is usually tied to a particular build or retrofit stage and an output the project team needs. The useful first conversation is about readiness, drawings, access and who is coordinating the work—not a prediction of the result. Ziverly can organise that test context while you are preparing equipment or completing another report.

A familiar moment

The renovated home approaching its planned test stage

You are finalising a result for another dwelling when a contractor calls about testing a deeply retrofitted house before handover. Ziverly can capture the property and project, new-build or retrofit context, test purpose and requested output as stated, target or design information supplied by the caller without interpreting it, build stage, envelope readiness, ventilation and combustion-appliance context at a broad level, drawings and previous test information, site contact, access, power availability, professional team and desired timing. It does not predict permeability, decide whether the dwelling is ready, provide preparation instructions beyond your approved checklist, diagnose leakage, interpret Building Regulations or project compliance, adjust systems, issue a certificate, quote, accept the appointment or promise a result. Test protocol, readiness, measurement, reporting and remedial advice remain with competent professionals. This page is focused on a defined project-stage measurement and its requested output rather than a general investigation of household draughts.

Where Ziverly can help

More room for the work.
A clearer thread afterwards.

The test belongs to a precise project stage

Openings, services, ventilation, documentation and site readiness can affect whether the planned visit is productive.

A target is not a promised result

Caller-supplied design values can be recorded without predicting measurement or declaring compliance.

Equipment and reporting require focus

A new test enquiry can be structured while you maintain the integrity of another dwelling's measurement and data.

What a better handover can change

Less interruption.
More useful context.

The requested test output is visible

Review project type, purpose, build stage, target information, documents, site contact, access and professional team.

Measurement remains independent

Approved boundaries keep readiness, protocol, result, leakage diagnosis, certification and compliance within your process.

A readiness detail can follow the project

Add the drawing, ventilation, site-contact or approved checklist question for Ziverly to ask if the caller returns.

Before, during and after the call

How Ziverly fits around
your working day.

☎Calls you choose≡Useful details→Your next step
  1. You decide which calls reach Ziverly.

    Use the call-diversion options supported by your mobile or landline service, such as no reply, unreachable, busy or rejected. Turn them off again whenever you want to answer normally, or use cover for evenings, weekends, holidays and unexpected time away.

  2. Your call details meet you where you are.

    Choose email or SMS alerts where enabled, then open Ziverly to review the summary, transcript, recording where available, status and priority.

    Review the project, test purpose, requested output, supplied target, build stage, readiness context, documents, site contact and access after your alert.

  3. The next conversation starts further forwards.

    Add an AI-facing note when you want Ziverly to have more context if the same known caller rings again. Separate private notes stay private.

    Add an AI-facing note with the response window or the drawing, ventilation, site-contact or approved checklist question still needed.

  4. Open calls do not have to rely on memory.

    Choose a daily or weekly email summary of calls still waiting for attention, at the time that best fits your working day.

  5. You can check in by phone, too.

    With Owner Voice Access enabled, call your own Ziverly number, verify your PIN and manage the calls you are allowed to see.

    After the current measurement and data are safely recorded, verify your PIN to hear which compliance-stage test enquiries await review.

Use your own numbers

Put unanswered
calls in perspective.

What might those enquiries represent for your business? Start with figures from your own recent calls.

The result is an illustration, not a forecast or a promise that Ziverly will recover the work.

Enquiries represented0
Monthly work value represented£0

This simple multiplication does not account for timing, capacity, costs, cancellations, repeat work or whether another response would have changed the outcome.

You keep the judgement

Your expertise.
Your boundaries.

Compliance testing must follow the applicable building regulations, approved methodology and recognised tester scheme requirements.

You remain responsible for the advice you give, the work you accept and the safety, eligibility and professional checks your business requires.

A few practical questions

Before you
get started.

Talk it through →
Can Ziverly predict whether the home will pass?

No. It records project and target context; only a properly conducted test can produce a result.

Will it diagnose where air is leaking?

No. Measurement, investigation and any remedial advice remain with competent professionals and the agreed scope.

Can it confirm the building is ready or compliant?

No. Readiness, protocol, certification and regulatory conclusions must follow your checks and authorised process.

Start with the calls you choose

Keep your attention
where it matters.

Choose what Ziverly should know, what it should never promise and which details make a follow-up useful. Create an account free, then add pay-as-you-go credit when you are ready.

← Back to Residential surveying & diagnostics