A familiar moment
The garage that needs to make way for a new project
You are overseeing waste movements on another job when a homeowner calls about demolishing a detached garage before an extension. Ziverly can capture the property and structure, what the caller wants removed or retained, construction and condition as described, proximity to the home and neighbours, existing asbestos or structural reports, services believed to be present, contents, access width, boundaries, parking, drawings, project stage, ownership and timing. It does not identify asbestos, judge instability, advise entry, disconnection or temporary support, select plant or sequencing, calculate waste, interpret notices, CDM duties or permissions, quote or accept the work. Collapse, fire, gas, electrical or other immediate danger requires the appropriate emergency route.